Published in United States

Meta Pilots Use of Mass Timber in Data Center Construction

Aug 02, 2025 | Posted by Abdul-Rahman Oladimeji

Meta has begun piloting the use of mass timber in the construction of its data center campuses, aiming to replace the use of steel and other building materials with wood-based products engineered for strength and durability.

According to Meta, the products are engineered for use in industrial applications, such as data centers, and include products like glue-laminated, wooden beams and columns (glulam), mass plywood, and timber wall assemblies.

The use of mass timber can have a significant impact on reducing the carbon intensity of data center construction. According to Meta, the incorporation of mass timber in these buildings will reduce the embodied carbon of the materials being substituted by around 41 percent. In addition, since most mass timber products are pre-fabricated, the need to weld steel onsite falls significantly, reducing the construction time by several weeks.

There are 4508 data centers in United States.

Site Aerial Map
Posted in Grandilla: Phoenix, Arizona Source: https://mccobagenda.databankcloud.com/AgendaOnline/Documents/DownloadFileBytes/02.03%20CPA250009%20Z250027%20BOS%20REPORT.PDF.pdf?documentType=1&meetingId=4622&itemId=264342&publishId=145477&isSection=False&isAttachment=True
Meta: Project Domino
Posted in Meta: Project Domino Source: https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/
Sequitor Edge Data Center
Posted in Sequitor Edge: Rapid City, South Dakota Source: https://sequitoredge.com/news/sequitor-edge-data-center-coming-to-rapid-city/
Proposed site for Wildwood Ranch AI Campus in Joplin, Missouri
Posted in Wildwood Ranch: Joplin, MO Source: Joplin City Council
Proposed site for Takanock's Project Baccara in Arizona
Posted in Takanock: Project Baccara Source: Takanock
Proposed sitemap for Project Laurel in Limerick Township
Posted in Project Laurel Source: Limerick Township | MCD 7 LLC
Proposed site plan for Project Flex in Lyon Township, Michigan
Posted in Verrus: Project Flex Source: Verrus
Proposed siteplan for Project Delta in Stokes County
Posted in Project Delta Source: Project Delta
EdgeConneX acquired a 180-acre parcel near AUS01 in Bastrop, Texas.
Posted in EdgeConneX: Austin AUS01 Source: Bastrop CAD
Preliminary siteplan for Cloverleaf's data center in St. Louis, Missouri
Posted in Cloverleaf: Troy Campus Source: Cloverleaf Infrastructure
Proposed site for Morris Technology Park
Posted in Tract: Morris Tech Park Source: Tract
Proposed layouts of the Janesville data center
Posted in APECS Data Center Campus Source: Planning documents
Site for QumulusAI's data center in Denton, TX
Posted in QumulusAI: Denton, TX |
Hut 8 launched Project Vega in Texas
Posted in Hut 8: Project Vega Source: Hut 8
Blueprint for Energy Storage Solution’s proposed Kingsboro AI Data Center
Posted in Kingsboro AI data center Source: Energy Storage Solutions LLC
Rendering of Beale Infrastructure's Project Atlas in Oklahoma
Posted in Beale: Project Atlas Source: Beale Infrastructure
Proposed site for Prologis' 13-building data center campus in Indiana
Posted in Prologis: Shelbyville, Indiana Source: City of Shelbyville
Rendering of Skybox San Angelo Data Center Campus in Texas
Posted in Skybox: San Angelo, Texas Source: Skybox
Proposed site for J5 LLC's data center campus in Piqua, Ohio
Posted in J5 LLC: Piqua, Ohio Source: Google Maps
Proposed site for Cetronia Road Data Center in Pennsylvania
Posted in Cetronia Road Data Center Source: Google Maps
Sitemap for Sabey's Decatur Technology Park in Indianapolis, Indiana
Posted in Sabey: Decatur Tech Park Source: Sabey Data Centers
A massive 827-acre data center proposed for Sand Springs, Oklahoma
Posted in Google: Project Spring Source: Sand Springs rezoning application
Proposed area for Rocklocker's Data Center in Kalkaska Township, MI
Posted in Rocklocker: Kalkaska Township, MI |
Rendering of Rowan Digital's Project Temple in Texas
Posted in Rowan: Project Temple Source: Rowan Digital Infrastructure
Proposed Wallace Jackson Data Center Campus in Spalding County
Posted in Wallace Jackson DC Campus Source: Spalding County
Proposed site for Forsyth Technology Campus in Georgia
Posted in Trammel Crow: Forsyth Tech Campus Source: Google Maps

Ready to Level up Your
Data Center Strategy?